A cloud migration changes the controls around your data and applications. Network rules, identities, storage permissions, and public endpoints may behave differently in the new environment. Verify them during cutover rather than assuming the old assessment carries over.
Why migration resets your security posture, not just your infrastructure
Compare the new deployment with the controls verified before migration. Review what was rebuilt, which defaults were accepted, and which temporary exceptions were added to make the move work.
During cutover, old and new infrastructure may run together. Include both in the asset list until the old environment is retired. Track replication endpoints, credentials, and copied data that exist only for the transition.
What changes: internet-facing services
Inventory new load balancers, API gateways, and migration endpoints. Check their public reachability and assign removal dates to temporary sync or replication services. Verify removal after cutover.
Confirm that services previously limited to internal networks remain restricted. Test the new subnet and gateway configuration before marking deferred network-segmentation work complete.
What changes: DNS
Review repointed DNS records and references to deleted cloud resources. A stale record may create a takeover opportunity depending on the provider’s ownership controls. Check its status rather than assuming an error page proves exploitability. Include newly issued certificates and hostnames in the asset inventory.
What changes: access controls
Review the identities and roles created or copied during migration. Find broad permissions granted for troubleshooting, stale keys, and service accounts still spanning both environments. Reduce temporary access after its dependencies are resolved and verify that required jobs still run.
What changes: storage exposure
Inspect new buckets and containers for public access and overly broad grants. Check the permissions on transferred objects too. Any temporary access used for bulk copying needs an owner, a removal date, and a verification result.
What changes: network configuration
Translate security groups, firewall rules, and segmentation into the new provider’s model. Review ports opened during troubleshooting and test separation between application and database tiers. Keep temporary rules in the change record so they can be found after the migration.
A before-and-after checklist: what's externally visible versus what requires account access
Plan public checks and authorized cloud-account review together. They provide different evidence about the new deployment.
From outside, inspect public addresses, gateways, DNS, certificates, reachable storage, and management interfaces. Check whether previously internal APIs became public. Review headers, cookies, CORS, and redirects for re-platformed applications.
With authorized account access, review IAM roles and keys, storage permissions, network rules, peering, and segmentation. Verify logging delivery and retention, encryption settings, and secrets handling. Inspect migration scripts and configuration for credentials that should have been removed.
Why timing matters more here than in a routine assessment
Arrange revalidation as part of cutover. Temporary network rules and access grants may still be active immediately after go-live. Record which checks must pass then and which unresolved items need follow-up owners and dates.
Why one assessment isn't the end of it
After migration, services, integrations, and permissions will continue changing. Keep the post-migration result as a dated baseline, then retest the affected controls when later changes alter them.
How this maps to a proper post-migration audit
Scope public assets and cloud-account controls explicitly. Ceron’s core audit covers up to fifty internet-facing assets and three authorized cloud accounts within its agreed terms. Provide the account access needed for IAM, storage, and network review; public responses alone cannot establish those settings.
For multiple accounts, hybrid systems, or more complex identity and network arrangements, agree deeper authenticated testing against the deployed architecture. Set recurring reviews around the change schedule and keep the original cutover findings available for comparison.
Closing the migration review
A completed migration shows that the move worked operationally. Before closing it, verify public exposure and cloud-account controls, retire transition access, and assign the remaining issues. Keep those checks in the release process for later infrastructure changes.